ποΈ ARCHIVED Β· Superseded by the REMAP Business Operating System (BOS) Β· October 2026
The EOS Scorecard has been replaced by the Weekly Scorecard. Do not follow this page.
Owner: HoD (Hamza Tasneem) + BA (Hammad Akram) β design and maintenance
Joint Ownership: Andrew Herbert (CEO β approves metrics and targets)
Department: D6 β Operations
Entity: REMAP.ai + PrivateAI (both)
Status: Recommended draft Β· Pending Andrew + HoD review
Version: 0.1 | Last updated: 2026-07-18
Classification: Internal
β οΈ This is a recommended draft β Andrew to confirm which metrics appear
on the company Scorecard and what the weekly targets are.
What this workflow does: Governs the company EOS Scorecard β a set of 5β15
key weekly measurables that give leadership an instant health read on the business
without needing to ask anyone for an update. Reviewed in the first 5 minutes of
every L10 meeting. Any Red metric is automatically added to the L10 Issues list
for IDS.
What triggers it: Weekly β updated by owners before the L10 meeting. The
Scorecard is not prepared for the meeting β it is maintained throughout the week
and ready before the meeting starts.
What it produces: A current, accurate Scorecard reading every week β each
metric Green, Amber, or Red against its weekly goal β feeding directly into the
L10 Issues list and the OPS-O03 Business Performance Dashboard.
Why it matters: The Scorecard makes management by exception possible. If
everything is Green, the meeting moves fast. If something is Red, the issue is
already named, owned, and on the agenda before anyone walks into the room.
| Rule | Detail |
|---|---|
| 5β15 metrics maximum | Fewer is better β too many metrics means none are watched properly |
| Weekly measurables only | Daily or monthly metrics do not belong on the Scorecard β use OPS-O03 for those |
| One owner per metric | Single named person responsible for entering the number each week |
| Weekly goal | Every metric has a specific weekly goal β not a range, not "improve", a number |
| RAG status | π’ Green = at or above goal Β· π‘ Amber = within 10% below goal Β· π΄ Red = more than 10% below goal |
| Red = Issues list | Any Red metric is automatically added to the L10 Issues list β no discussion in the Scorecard segment, just identification |
| CEO approves changes | Adding, removing, or changing metrics or targets requires Andrew's approval |
β οΈ These are proposed metrics. Andrew to confirm which appear on the
company Scorecard, what the weekly goals are, and who owns each one.
| # | Metric | Owner | Weekly goal | Source |
|---|---|---|---|---|
| 1 | Discovery calls held | Umar | β₯ 10 | Jira pipeline |
| 2 | Quotes issued within 24h of call | Umar | β₯ 10 | Twenty / Gmail |
| 3 | Deposits collected ($) | Umar | β₯ $6,000 | Xero |
| 4 | Qualified leads from Marketing (MQL) | Shahzaib | β₯ 15 | Twenty source tags |
| 5 | Active AIe/AIc engagements | HoD | Track and grow | DEL-05-DOC-02 |
| 6 | Projects delivered on time (%) | PM | β₯ 90% | Jira milestone data |
| 7 | Client health β no Red signals | Zimal | 0 Red signals | CS-05-DOC-01 |
| 8 | NPS score (rolling) | Zimal | β₯ 8.5 | CS-04 / Typeform |
| 9 | Cash runway (months) | Finance Lead | β₯ 6 months | OPS-F01c |
| 10 | Deals aged >14 days without proposal | Umar | β€ 3 | Twenty |
Who updates it:
Each metric owner enters the number for their metric before the L10 meeting β
same day each week, every week.
When:
Entered before the L10 meeting starts. Never during the meeting.
How:
Entered into the Scorecard document (OPS-O04d-DOC-01 β Google Sheet). The RAG
status calculates automatically from the entered number vs the weekly goal.
In the L10:
HoD or BA presents the Scorecard in the Scorecard segment (5 minutes). Red metrics
are named and moved to the Issues list. Green and Amber metrics are noted and
the session moves on.
| Tool | How it's used | Agent-ready |
|---|---|---|
| Google Sheets | OPS-O04d-DOC-01 Scorecard β metric entry, RAG calculation, weekly history | Yes β API + MCP |
| REMAP_KPI_Scorecards.xlsx | Departmental KPI tracking that feeds the company Scorecard | Available on Google Drive |
| n8n | Planned: auto-pull metric values from source systems before L10 | Yes β native |
| Jira | Source for delivery and pipeline metrics | Yes β confirmed |
| ClickUp | Source for sales pipeline metrics | Yes β API |
Upstream (feeds the Scorecard):
Downstream:
| Version | Date | Description | Author |
|---|---|---|---|
| 0.1 | 2026-07-18 | Recommended draft β proposed 10 company Scorecard metrics with owners and weekly goals. Pending Andrew + HoD confirmation of final metric list and targets. | BA (Hammad Akram) |